All experiments

07 / Petterik lab

Bridge breaker

Draw the road, snap supports into its joints, then let an increasingly unreasonable sequence of trucks question your engineering.

Draw a connected road from bank to bank, then brace it with triangles.

Draw the dark road first, then switch to supports and snap braces into its joints. Trucks only follow the road, so supports can cross around it. Connected triangles raise capacity; a structural failure releases every joint.

Built to be played with. These are small prototypes with room to grow.

Have something in mind? Let’s talk